ForexCommand
IN DEVELOPMENT

· EARLY ACCESS ·

Above your platform.No window switching.

Overlay · Windows

The desktop overlay for intraday forex traders.

  • Market sessions, economic calendar & news
  • Market readiness score in real time (MRS)
  • Carry Trade Score (CTS)
  • Forex Strength Index (FSI)
  • Trade journal integrated with MT5
  • And more...

How many tabs do you have open right now?

metatrader5
MetaTrader 5

MetaTrader 5

Execution platform

forexfactory
ForexFactory

ForexFactory

Economic calendar

investingcom
Investing.com

Investing.com

Rates & sentiment

myfxbook
Myfxbook

Myfxbook

Retail positioning

tradingview
TradingView

TradingView

Technical analysis

You jump from tab to tab. You lose context.

You arrive two seconds late to the setup you'd been tracking for half an hour.

It's not lack of analysis.

It's lack of real-time visibility.

ForexCommand lives on top of everything.

Always.

Compatible with your MT5 broker

IC Markets
Admiral Markets
Exness
forex.com
Pepperstone
XM
HF Markets
Octa

One overlay. All the context.

48px

compact mode

Always on top

Anchored above your trading platform. Compact mode takes 48 px — always visible, never in the way.

5+

data sources

All in one

Sessions · News · Rates · Alerts · Journal. No window switching. No extra tabs.

0–100

readiness score

Decide in 3 seconds

The MRS combines 5 factors into a 0–100 score. The answer is already on screen.

Everything you need for your trading day.

Without leaving your platform.

01

Is now a good time to trade? One number tells you.

  • ·ATR Volatility — is there enough movement?
  • ·Session liquidity — are you in institutional hours?
  • ·News risk — high-impact event incoming?
  • ·Rate differential — do central banks give direction?
  • ·Retail positioning — contrarian signal from the crowd.
AvoidCautionAcceptablePrime Time
MRS · Market Readiness
MRS history
ForexCommand
Main window Gantt

02

Market sessions. Always in context.

Gantt timeline showing active sessions (Asia, Sydney, London, New York), a real-time now-line, and economic events as colored dots. One click opens full event detail. Triple clock: Broker · UTC · Local.

Trade Journal
Your trade history, enriched with market context.

03

Your trade history, enriched with market context.

Auto-sync with MT5. Each trade is enriched with active session, MRS and nearest event. Log · Calendar · Stats · Reports.

Economic Calendar
Never miss the NFP again.

04

Never miss the NFP again.

Desktop alerts configurable by lead time, impact level and pair. Cross-restart deduplication included.

CTS History
CTS

05

CTS

Carry Trade Score: spread + session + ranking + news risk.

Compact Mode · 48px overlay
Compact Mode

06

Compact Mode

A 48 px always-on-top overlay that pins above your platform. Full MRS badge, session indicator and now-line — zero screen real estate wasted.

FSI · Forex Strength Index
FSI

07

FSI

Forex Strength Index. Macro sentiment at a glance.

13

Available in ES · EN

Full interface in Spanish and English. Switch from the title bar.

14

Always-on-Top Windows

Every panel floats above your trading platform. Correlation Matrix, FOTSI, Calendar — pin the tools you need, right where you need them.

15

Broker UTC Offset

Set your broker's UTC offset so sessions, alerts, and trade timestamps always align with your actual market hours — no manual conversion needed.

16

Local Timezone

All times display in your local timezone. ForexCommand adapts to wherever you trade — from New York to Tokyo.

MARKET INTELLIGENCE

Every edge. One window.

16 tools built to read the market before it moves. Sessions, correlation, currency strength, carry trade, news, positioning — synthesized into one number, surfaced in one window.

Count me in

16

tools

5

MRS factors

0–100

readiness score

ZERO

telemetry

MRS in detail.

5 factors. 1 number. The clarity the market doesn't give you.

MRS History window — Forex Command

ABOUT THE MRS

The MRS (Market Readiness Score) evaluates in real time whether market conditions are favorable for trading. It combines 5 independent factors — technical, fundamental, and sentiment — into a single 0–100 number.

Factor composition

ATR Volatility30/100

14-period ATR — measures whether the market is generating enough range for trades to breathe.

Session liquidity25/100

Active session weight — London and the New York overlap are the highest-liquidity windows.

News risk20/100

High-impact event proximity — score drops in the window leading up to major releases.

Macro differential15/100

Central bank policy divergence — a larger rate differential means stronger directional bias.

Positioning10/100

Retail trader positioning via Myfxbook — scored contrarian to the crowd consensus.

Score zones

0255075100
AVOID0–24
CAUTION25–49
ACCEPTABLE50–74
PRIME TIME75–100

Choose your access.

30-day full Pro trial on every install. No credit card required.

Free

$0forever
  • Session timeline + compact 48px overlay
  • News: next upcoming event only
  • ECB rates — 7 major pairs
  • MRS readiness score (number)
Join the waitlist →

Lifetime

★ EARLY ADOPTER
$129

one-time · lifetime access

  • Session timeline + compact 48px overlay
  • ECB rates — 7 major pairs
  • Full MRS (5 factors + 15-day history)
  • CTS Carry Trade Score
  • FOTSI Oscillator — 8 TSI lines
  • Correlation Matrix — 7×7 Pearson
  • Currency Heatmap by session
  • TPO / Volume Profile
  • All news modes + alerts + weekly calendar
  • Trade journal + MT5 auto-sync
  • Updates included forever
  • Priority support
Secure my spot · free to join →

30-day money-back guarantee

100 slots · 6 months from launch

Pro

$9/ month
$79/yr
$108save $29
  • Session timeline + compact 48px overlay
  • ECB rates — 7 major pairs
  • Full MRS (5 factors + 15-day history)
  • CTS Carry Trade Score
  • FOTSI Oscillator — 8 TSI lines
  • Correlation Matrix — 7×7 Pearson
  • Currency Heatmap by session
  • TPO / Volume Profile
  • All news modes + alerts + weekly calendar
  • Trade journal + MT5 auto-sync
  • 30-day free trial — no credit card
Join waitlist

Cancel anytime

19 ENTRIES

Frequently asked questions.

fxcmd --help

For now, yes. ForexCommand is a Windows 10/11 desktop widget built with .NET 8 WPF. Linux, Mac and a mobile app for Android and iOS are on the roadmap.

No. MT5 is optional. ForexCommand works independently with any broker — sessions, MRS, news and all analysis tools require no MT5. The MT5 integration only enables automatic trade journal sync.

The full overlay works with any broker, whether you use MT4 or not. However, automatic journal sync requires MT5: MT4 does not have the external Python API that the ForexCommand bridge uses to read your trades in real time.

The Market Readiness Score (MRS) is a 0–100 composite that combines ATR, session liquidity, news risk, rate differential and retail positioning in real time.

The Carry Trade Score (CTS) measures the attractiveness of each currency for carry strategies — profiting from the interest rate differential between currencies. It combines rate spread, session activity and market positioning into a 0–100 score.

FOTSI is a currency strength oscillator that shows the relative momentum of 8 currencies (EUR, USD, GBP, JPY, CAD, AUD, NZD, CHF) using the TSI (True Strength Index) indicator. It helps identify which currencies have momentum and which are weakening.

A 7×7 table showing the Pearson correlation between the 7 major forex pairs. It lets you spot pairs that move in the same direction (positive correlation) or opposite directions (negative) — essential for managing risk when holding multiple positions.

The Heatmap shows the strength of each major currency per market session (Asia, London, New York). A more intense color indicates higher activity or relative strength, helping you spot real-time strength trends at a glance.

TPO (Time Price Opportunity) shows how much time price spent at each level — the most-traded level is called the Point of Control (POC). Volume Profile adds actual volume per level, revealing institutional support and resistance zones visible regardless of your broker.

A full log of your trades with statistics by strategy, session and instrument. It syncs automatically with MetaTrader 5 and enriches each trade with the MRS and CTS at entry time, so you can analyse the market context of every operation.

Free includes the session timeline, ECB rates and the real-time MRS score. Lifetime unlocks full MRS with history, CTS, FOTSI, Correlation, Heatmap, TPO, all news modes with alerts and the trade journal with MT5 sync.

Both plans include the same full feature set. The difference is the payment model: Pro costs $9/month or $79/year (with a 30-day free trial); Lifetime is a one-time $129 payment with lifetime access and all future updates included. Lifetime is only available during the early adopter period.

Yes. The one-time payment includes all future updates to the product, forever.

We're in active development. The waitlist will receive the launch notification first, with a 30-day full free trial.

100 Lifetime accesses at the early adopter price ($129), available for 6 months from launch — whichever comes first. Once slots sell out or the period ends, the Lifetime plan disappears and only the Pro subscription remains.

Yes. The app is available in both English and Spanish. Support is offered in both languages.

External notifications — Telegram, Discord and HTTP webhook alerts so you get notified on your phone even when away from your PC. Waitlist users will be the first to activate them.

No. ForexCommand has no telemetry or analytics. The only network connections are to the market data server you control (localhost). Your data stays on your PC. The installer is verified on VirusTotal with 0 detections.

Yes. The Lifetime plan comes with a 30-day full money-back guarantee, no questions asked. If you are not satisfied at launch, you get your money back.

19Q&A — ForexCommand FAQEOF

The overlay your setup was missing.

Join the waitlist. No card. No commitment. You'll be first to know when access opens.

Lifetime access · $129 one-time · 100 slots · Launch only

No telemetry100% local dataWindows 10 / 11VirusTotal 0/72